Recent Project
Octapharma Plasma — Lab Remodel
Project Overview
GMPI completed plumbing work for a full phased lab remodel at Octapharma Plasma in Colton, including underground rough-in and finish installation. Based on the project photos, the work covered both below-grade infrastructure and finished interior plumbing for a clean, operational healthcare-style environment.
Scope of Work
This phased remodel required GMPI to support the project from early excavation through completed fixture installation, while work progressed around an occupied commercial facility setting.
- Underground plumbing rough-in during excavation and trenching phases
- Site utility tie-ins and below-grade piping installation
- Interior lab and sink plumbing connections
- Finish plumbing for hand sinks, restrooms, and support areas
- Coordination across multiple phases of the remodel
What This Project Included
- Lab / clinical-style sink installations with accessible handwashing stations
- Breakroom or support sink plumbing with finished stainless double-basin fixture connections
- Restroom finish plumbing with clean, modern commercial fixtures
- Underground piping work shown in active trench and excavation conditions
- Phased interior improvements in a high-traffic customer service and donor processing environment
Project Result
This project highlights GMPI’s ability to manage plumbing scope from the ground up—starting with underground rough-in and carrying the work through to final fixture installation in a finished healthcare-oriented facility. The completed spaces shown in the photos reflect a clean, durable, commercial-grade result built for daily operational use.
Need Plumbing for a Lab Remodel or Phased Commercial Project?
Text or call GMPI to discuss underground rough-in, phased remodel work, and finish plumbing installation.
Licensed • Bonded • Insured • Commercial / Industrial / Medical / Multi-Family
