Recent Project

Octapharma Plasma — Lab Remodel

Location: 1101 N. Mount Vernon Ave, Colton, CA 92324

Project Overview

GMPI completed plumbing work for a full phased lab remodel at Octapharma Plasma in Colton, including underground rough-in and finish installation. Based on the project photos, the work covered both below-grade infrastructure and finished interior plumbing for a clean, operational healthcare-style environment.

Scope of Work

This phased remodel required GMPI to support the project from early excavation through completed fixture installation, while work progressed around an occupied commercial facility setting.

  • Underground plumbing rough-in during excavation and trenching phases
  • Site utility tie-ins and below-grade piping installation
  • Interior lab and sink plumbing connections
  • Finish plumbing for hand sinks, restrooms, and support areas
  • Coordination across multiple phases of the remodel

What This Project Included

  • Lab / clinical-style sink installations with accessible handwashing stations
  • Breakroom or support sink plumbing with finished stainless double-basin fixture connections
  • Restroom finish plumbing with clean, modern commercial fixtures
  • Underground piping work shown in active trench and excavation conditions
  • Phased interior improvements in a high-traffic customer service and donor processing environment

Project Result

This project highlights GMPI’s ability to manage plumbing scope from the ground up—starting with underground rough-in and carrying the work through to final fixture installation in a finished healthcare-oriented facility. The completed spaces shown in the photos reflect a clean, durable, commercial-grade result built for daily operational use.

Need Plumbing for a Lab Remodel or Phased Commercial Project?

Text or call GMPI to discuss underground rough-in, phased remodel work, and finish plumbing installation.

Licensed • Bonded • Insured • Commercial / Industrial / Medical / Multi-Family